Construction starts long before the first wall goes up.
Before we can build a 170-foot demising wall, we need to install a temporary 170-foot dust barrier to separate construction from an active tenant space.
It’s one of those behind-the-scenes details that keeps businesses operating while work moves forward.
The calm before the storm.