04/13/2026
Another project completed for a repeat customer.
We updated their back entry landing with new composite decking for a clean, low-maintenance surface, along with white vinyl railing and posts. While the stairs had to be fully rebuilt due to rot, the new layout ensures a safer and more comfortable use.
We used the existing framing for the landing and reinforced it by adding blocking and bracing where needed. The tops of the joists were also taped to help protect against moisture and extend the life of the structure.
The perimeter was finished with white PVC skirting to give the landing a more finished, clean appearance.
Simple, durable, and built to last!