Trowt Connolly Construction

Trowt Connolly Construction Fifth generation builders/remodelers, applying knowledge and craftsmanship to each and every job, with a commitment to excellence.

This new powder room received a brick floor. We grouted the joints, with mortar, up to the top of the bricks, for easier...
08/24/2026

This new powder room received a brick floor. We grouted the joints, with mortar, up to the top of the bricks, for easier cleaning. After this has cured, for the proper amount of time, we will acid wash it and an epoxy sealer will be applied.

This powder room received a facelift with a new tile floor, new baseboard, and a fresh coat of paint.
08/04/2026

This powder room received a facelift with a new tile floor, new baseboard, and a fresh coat of paint.

It is always a compliment when people in the same neighborhood ask you to do work. We are about to begin a project on th...
07/24/2026

It is always a compliment when people in the same neighborhood ask you to do work. We are about to begin a project on the 10th house on this particular street and the 17th house in this neighborhood. We are very grateful to our wonderful clients in this area, who continue to refer us.

We are celebrating 40 YEARS of our Wellesley phone number being in service! This phone number has been with us since we ...
06/22/2026

We are celebrating 40 YEARS of our Wellesley phone number being in service! This phone number has been with us since we opened our little office, on River Street in Wellesley Massachusetts, in 1986.

Here we installed new Marvin windows in the back of this historic Boston brownstone.
06/12/2026

Here we installed new Marvin windows in the back of this historic Boston brownstone.

A fresh coat of paint on the walls, always seems to brighten up a space.
06/06/2026

A fresh coat of paint on the walls, always seems to brighten up a space.

A client asked us to continue the look of the new baseboard, that we were installing, down their stairway. We removed th...
05/30/2026

A client asked us to continue the look of the new baseboard, that we were installing, down their stairway. We removed the caps from some of the new baseboard pieces and installed them on top of the existing skirt boards. Since the stairs ended at a corner, we needed to come up with this unique transition, in order to carry the moulding into the different height baseboards.

At the beginning of this week, we installed this custom ordered solid mahogany double entry door, in the Back Bay of Bos...
04/14/2026

At the beginning of this week, we installed this custom ordered solid mahogany double entry door, in the Back Bay of Boston. It is hard to beat the elegance of real mahogany wood.

Installing 8’ doors can be challenging, just from the awkwardness of their size. This door had the added challenge of th...
04/06/2026

Installing 8’ doors can be challenging, just from the awkwardness of their size. This door had the added challenge of the tile flooring on the other side not extending under the previous jamb. This meant that we had to line up our door frame perfectly in the opening, so that the space where the tile ended did not show.

It’s hard not to like the look of     Today we installed these brass hinges on a client’s custom ordered door. We pre-dr...
03/31/2026

It’s hard not to like the look of Today we installed these brass hinges on a client’s custom ordered door. We pre-drilled all of the screw holes and installed the screws by hand with a screwdriver, so that nothing was scratched or stripped.

Address

Sutton, MA

Alerts

Be the first to know and let us send you an email when Trowt Connolly Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Trowt Connolly Construction:

Shortcuts

Share