Here are the finished pictures of my previous remodel post. As I said , full exterior paint , full interior patch and paint with 2 coats of primer, new bath tub , mixing valve , drain assembly ect, full custom tile surrond, tiled counter top for vanity with new sink , sheulder trim on both , all doors , cabinets painted with new hardware on all,new lighting and ceiling fans throughout, new outlets plus switches , kitchen new counter tops , backsplash ,sink , faucet and flooring throughout with all new appliances
WE WERE ABLE TO BEAT THE CUSTOMERS DEADLINE WHICH WAS 30 DAYS BY GETTING IT ALL COMPLETED IN 26 DAYS WITH PROFESSIONALISM AND QUALITY THAT IS EXPECTED.