Studio Prime Engineering

Studio Prime Engineering Studio Prime Engineering is a team of engineers who specialize in residential and commercial projects

This downtown SLO mixed-use build is coming along! Catch the latest progress as you drive down Marsh St.
08/07/2026

This downtown SLO mixed-use build is coming along! Catch the latest progress as you drive down Marsh St.

07/31/2026

The 24 new Single Family Homes at Hill Street Terraces in Nipomo are nearly complete!



07/26/2026

Demolition is happening over in Pismo Beach! Stay tuned to see grading, formwork and foundations!

07/23/2026

Steel is in at Trinity! This milestone marks a major step forward as the structural steel beams—engineered to carry the loads of the commercial portion of the building—are now in place. Every beam plays a critical role in creating a strong, reliable framework that will support the spaces below for years to come. Stay tuned as construction continues to take shape.

07/21/2026

Progress is happening fast on this custom home! Roof tiles are being installed, the pool is taking shape, and it's exciting to see the design come to life. We can't wait to share the next phase as this beautiful home continues to transform.



07/16/2026

A successful project starts with the right team.

At Studio Prime Engineering, we believe thoughtful coordination is just as important as thoughtful design. By considering every factor and collaborating with everyone involved—from owners and architects to contractors and consultants—we help create smoother projects, reduce costly surprises, and keep construction on schedule and within budget.

Because great engineering isn't just about designing structures—it's about helping every project succeed.

ement

07/08/2026

Phase 3 framing is underway at Trinity. Stay tuned to see this mixed-use project come together.



05/29/2026

Getting a mat slab pour of this size done in a single day takes insane precision, and skill. Starting at 2 AM ensures optimum workability for the concrete and keeps the project on schedule. This slab is going to support the newest mixed-use building in . Stay tuned for more progress.

Shoutout to the LW Construction crew and CCB team making it all happen!




Phase 3 foundation pour at Trinity in Grover Beach.  Stay tuned to see this project progress!
05/28/2026

Phase 3 foundation pour at Trinity in Grover Beach. Stay tuned to see this project progress!

05/12/2026

Engineering the perfect vault. 📐 Which would you choose?

Ridge Beam: Maximum volume, structural elegance.
Vaulted Truss: Cost-effective, quick to install, and efficient.

Both look great, but the structural requirements are worlds apart.

Let’s figure out which one fits your layout.

📲 DM for a project consultation.

Address

971 Osos Street
San Luis Obispo, CA
93401

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+18054768101

Alerts

Be the first to know and let us send you an email when Studio Prime Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Studio Prime Engineering:

Shortcuts

Share