10/03/2026
A look back at a major project in San Diego’s Fashion Valley.
Our team placed approximately 17,000 cubic yards of concrete for this 320,000-square-foot podium structure, supporting 316 residential units above two levels of parking and two podium decks.
Proud of the craftsmanship and coordination our team brought to this project. Thank you to everyone who helped make it happen.
A fun fact: the Meier family has placed all 3 structures against the hillside along this section of Friars!