08/31/2026
Second floor framing is up on our North Providence fire restoration rebuild.
This house is coming back from the basement up after the fire. Walls are standing, openings are cut, and the second floor is ready for windows this week. You can see the layout taking shape and the structure locked in before the next trades hit the job.
If you’re dealing with fire damage, a full remodel, or need framing and finish work in Rhode Island, message us for a free estimate.