Wires R Us Inc.

Call Website Contact the business

Wires R Us Inc. Electrical Contracting Service. Serving the Black Hills since 1999

10/17/2026

Sound on for this one.

We’re roughing in a basement that used to be unfinished and they’re getting it finished out. Insulation and plastic were already up so we had to cut some plastic and pull insulation to get our wires in. Just drilling and pulling and making sure everything is nice and stable.

10/17/2026

Plans said 72, he laid out 72.5. Why?
Drywall.
If you don't look at the plans and account for it during layout, the island lands wrong in the finished house. Half inch now saves you a headache later.

10/16/2026

Pull felt way too light. No tension at all.

Pulled it out and it was cut clean inside the pipe. That's why this run had no power.😂

10/16/2026

His first time laying out a house.

Proper training matters. The journeyman stayed back instead of going to hang lights so nothing gets missed. Door swing, code, how the finished house will look. It's all decided during layout.

10/16/2026

Roughing in a basement. Marking out switches, laying out plugs, hammer flip, hanging boxes, running wire clean, and getting material back to the van.
Clean rough-in from the start makes the finish easy.

10/15/2026

The guys are getting some can lights hung up and making sure they're sitting right.
We feel like cans are just easier and faster to wire up, and when we have to swap one later we don't have to worry about insulation falling down into the house.
We use wafers too, but cans have their perks. What are you guys running more of these days?

10/14/2026

Little things separate a good rough-in from a callback.
Think about door swing before you place that receptacle, and always check what's on the other side before you drive a staple.
It's the small habits that keep a house clean and safe.

10/14/2026

Negative temps, snow on the ground, pulling through pipe.
It's easy to be miserable in this weather. Takes a good journeyman to keep the whole crew fired up and energetic.
That's real leadership on a job site.

10/13/2026

Fifty-plex. Done.
Not a single wire missed, all pulled straight, paint covers on, scraps picked up, hallways clean.
That's how we leave a job.

10/12/2026

The #1 time waster on any job site.
Making 3 trips to the van when 1 will do.
It's all about having a plan and remembering the small stuff, so you can get to pulling wire quicker.

Address

Piedmont, SD
57769

Opening Hours

Monday 7am - 4pm
Tuesday 7am - 4pm
Wednesday 7am - 4pm
Thursday 7am - 4pm
Friday 7am - 4pm

Telephone

+16057878783

Alerts

Be the first to know and let us send you an email when Wires R Us Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Wires R Us Inc.:

Shortcuts

Share

Category