Charles house progress Parsons,KsBroke ground 09/01/26550’ of footings350’ of 4’ tall stem wallCrawl space rat slabWater...
10/10/2026

Charles house progress Parsons,Ks
Broke ground 09/01/26
550’ of footings
350’ of 4’ tall stem wall
Crawl space rat slab
Waterproofing and drain-tile installed
Garage floor and porches poured Monday this week.
Floor and wall framing is completed today.
Wall sheeting and trusses next week

5am  42 yrd wall pour. Parsons,ks
09/17/2026

5am 42 yrd wall pour. Parsons,ks

Two driveway entrance’s installed last week. Replaced one culvert, new 6” paving with stem walls. Asphalt patched and ya...
07/21/2026

Two driveway entrance’s installed last week. Replaced one culvert, new 6” paving with stem walls. Asphalt patched and yard seeded. Parsons,ks

22’x30’ house addition in altamont,ks 13’x30’ stamped patioHartman Custom Cabinetry Inc built the custom walnut entertai...
06/21/2026

22’x30’ house addition in altamont,ks
13’x30’ stamped patio
Hartman Custom Cabinetry Inc built the custom walnut entertainment center

980 ton of asphalt millings hauled, graded and rolled on this driveway.
06/09/2026

980 ton of asphalt millings hauled, graded and rolled on this driveway.

Have you been thinking about getting that new shop or machine shed built? Rather it’s a steel building or wood frame, we...
06/06/2026

Have you been thinking about getting that new shop or machine shed built? Rather it’s a steel building or wood frame, we can provide a turn key project. Now is the time to reach out, we have openings this fall to have your dream build completed.

Wrapped up the exterior portion and liner panel package of this 80’x130’ metal building a few weeks ago. Sheetrock is hu...
03/26/2026

Wrapped up the exterior portion and liner panel package of this 80’x130’ metal building a few weeks ago. Sheetrock is hung and finished in the office space. Paint and drop ceilings next week.

6-8’ of mud coming out of this pond. Give us a call for any dirt work needs
03/14/2026

6-8’ of mud coming out of this pond.
Give us a call for any dirt work needs

Concrete phase is completed on this project660’ of 2’x16” footings80’x120’x 6” slab on grade80’x10’ porch4- 20’x11’ appr...
02/03/2026

Concrete phase is completed on this project
660’ of 2’x16” footings
80’x120’x 6” slab on grade
80’x10’ porch
4- 20’x11’ approaches
308 cubic yards
8 ton of 1/2” rebar 18” o.c.

Red iron is going up now

40’x60’x12’ red iron we build a few months ago. Burnished slate roof, wainscote and trim. Desert sand walls. 5” of spray...
12/29/2025

40’x60’x12’ red iron we build a few months ago.
Burnished slate roof, wainscote and trim.
Desert sand walls.
5” of spray foam insulation

Subcontractors are almost finished and ready for sheetrock in the living quarters.

Address

1531 21, 000 Road
Parsons, KS
67357

Telephone

(620) 778-3424

Website

Alerts

Be the first to know and let us send you an email when Volmer Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share