Another driveway almost complete!
We enjoyed getting this driveway installed for some good friends of ours. We truly appreciate them trusting Oak Ridge Construction, LLC to get the job done!
Five culvert pipes had to be installed on this driveway due to the rolling terrain.
31 loads of dirt hauled in to build the road base and some were topsoil.
Five loads of 34 rock spread and rolled in, and then topped off with a layer of Crusher Run.
Both sides of the driveway will be hydroseeded to prevent erosion.
Give us a call for your clearing, grading, excavation, and driveway needs!