10/14/2026
This is a throwback to one of the top five worse conditions that we have been a part of. What started off as a simple waterproofing project under the direction of another firm with "no substantial deficiencies", ended as an emergency shoring and full scale post tension restoration project when it was discovered that only 34 of 130+ tendons had tension. Since its construction in the 1970's, the PT grout pockets had no grout and were below the grade leading up to this elevated arrival deck. This caused extensive deterioration of the live end anchors substantial deterioration and the tendons slipping through the wedges and losing stress. The deck was fully shored and each of the tendons and their anchors were replaced.