09/15/2024
Master bedroom remodel. 12 work days in, Furniture back in tomorrow. Room was gutted to the studs, sub floor and Ceiling joists. Removed old 12" beam, replaced with steel, new lighting, Insulation, drywall, and wall paper and salvaged paneling below. Nickel Gap Shiplap ceiling with 8" faux beams to give it that Captains Cabin look with the arch top windows.