DAAB ConTech

DAAB ConTech Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from DAAB ConTech, Architectural Designer, Miami, FL.

This Memorial Day, we honor the legacy of those who served with courage and made the ultimate sacrifice.Their bravery in...
05/25/2026

This Memorial Day, we honor the legacy of those who served with courage and made the ultimate sacrifice.
Their bravery inspires us to build with purpose, lead with integrity, and never forget the freedoms we enjoy today.

From all of us at DAAB ConTech, thank you to our heroes.

Behind every successful project, there’s a team controlling the details others miss.At DAAB ConTech, we lead coordinatio...
05/04/2026

Behind every successful project, there’s a team controlling the details others miss.

At DAAB ConTech, we lead coordination through BIM with a proactive approach—aligning disciplines early, resolving conflicts before they become problems, and delivering models that are fully buildable, not just visually accurate.

We don’t react to issues—we eliminate them before they impact your schedule or budget.

The result: tighter coordination, faster ex*****on, and real cost efficiency on site.

When complexity increases, precision isn’t optional—it’s critical.

Let’s build with certainty 🤝

Meet the Team | Diego Gaspar 👷‍♂️As an Architect and BIM Project Manager at DAAB ConTech, Diego Gaspar focuses on bringi...
04/07/2026

Meet the Team | Diego Gaspar 👷‍♂️

As an Architect and BIM Project Manager at DAAB ConTech, Diego Gaspar focuses on bringing structure, clarity, and efficiency to complex project environments.

His work goes beyond coordination—he builds workflows and custom tools that connect platforms like Revit, Navisworks, ACC, SharePoint, and Power BI, making project information more accessible, actionable, and reliable. ⚙️💻

With a strong focus on BIM coordination, multidisciplinary model review, and workflow automation, Diego specializes in turning complex coordination challenges into clear, repeatable processes that keep teams aligned and projects moving forward. His approach combines technical precision with systems thinking—ensuring that issues are identified early, tracked effectively, and resolved before reaching construction. 📊

His experience includes key contributions to large-scale residential developments such as: 🏗️

🟥 Icon Beach “The Diplomat” — 39-story residential tower, leading risk analysis and clash detection for 100% construction design
🟥 The JEM — 65-story residential building, leading coordination efforts, MEP modeling, electrical documentation, and multidisciplinary collaboration
🟥 North Miami Square — 7-story residential project, overseeing BIM lead coordination and modeling for architecture, structure, and MEP

Driven by continuous improvement and a passion for optimizing how teams work, Diego plays a key role in developing smarter, more connected BIM processes that support better project outcomes. 🚀

High-end amenity spaces like those at South Flagler House demand more than design—they require precise MEP coordination ...
04/01/2026

High-end amenity spaces like those at South Flagler House demand more than design—they require precise MEP coordination from day one.

When multiple aquatic systems share the same environment, even small coordination gaps can lead to delays, rework, and increased costs.

That’s why leading teams rely on BIM & VDC workflows to ensure systems are aligned, coordinated, and ready for construction before installation begins.

At DAAB ConTech, we help projects move forward with confidence, clarity, and buildable solutions.

If you’re looking to reduce risk and optimize coordination on your next project, let’s talk.
📩 Message us to get started

👷‍♂️ Meet the Team | Alarik AzuetaAt DAAB ConTech, our strength comes from the people behind every model. Today we’re ex...
03/24/2026

👷‍♂️ Meet the Team | Alarik Azueta

At DAAB ConTech, our strength comes from the people behind every model. Today we’re excited to introduce Alarik Azueta, BIM/VDC Job Captain.

With nearly 4 years in the AEC industry, Alarik combines his architectural background with strong experience in BIM modeling and multidisciplinary coordination. His work focuses on developing accurate models, resolving clashes, and ensuring design intent is clearly translated into coordinated solutions for construction.

Recently, he led BIM coordination for the BCCCH Restaurant project, where the challenge was coordinating multiple building systems within a very limited space. Through detailed modeling and continuous coordination, he helped ensure all disciplines could fit and function efficiently.

This experience strengthened his coordination workflows and reinforced the importance of clarity, organization, and collaboration in BIM processes.
What drives Alarik is the ability to solve real-world challenges through digital models and continue growing within the evolving BIM/VDC space.

👏 Proud to have him as part of the DAAB ConTech team.

TeamSpotlight BIMCoordination

Celebrating Women in Construction Week 👷‍♀️💻This week, we recognize the women who are shaping the construction industry ...
03/05/2026

Celebrating Women in Construction Week 👷‍♀️💻

This week, we recognize the women who are shaping the construction industry through innovation, precision, and leadership.

At DAAB ConTech, BIM is more than modeling — it’s coordination, strategy, problem-solving, and collaboration at the highest level. The women on our team contribute across every area: from modeling and clash detection to project management, operations, marketing, business development, and team leadership.

Their expertise strengthens our workflows, their perspective enhances coordination.
and their commitment elevates our standards.

In a field driven by accuracy and collaboration, diverse voices are not just valuable — they are essential.
Today, we celebrate every woman at DAAB ConTech who helps us deliver smarter models, stronger coordination, and better project outcomes.
Your impact goes far beyond the screen — you are helping build the future of our industry.

WomenInBIM BuildingBetterTogether

For the 2900 Waste Management WTS project, DAAB ConTech delivered laser scanning and architectural as-built BIM modeling...
01/12/2026

For the 2900 Waste Management WTS project, DAAB ConTech delivered laser scanning and architectural as-built BIM modeling to establish an accurate baseline for an upcoming renovation.

Using scan-verified data, the model reflects existing architectural conditions and supports informed design decisions while reducing uncertainty during early project stages.

If your project requires laser scanning, architectural as-built BIM, or BIM/VDC support for renovation planning, DAAB ConTech is ready to support your next phase.

📩 Let’s connect.

As we step into a new year, we want to wish everyone a year filled with new opportunities, continued growth, and shared ...
01/01/2026

As we step into a new year, we want to wish everyone a year filled with new opportunities, continued growth, and shared success 🎉✨

Thank you to our team, clients, and partners for being part of the journey. We look forward to building, collaborating, and innovating together in the year ahead.

Wishing you a successful and prosperous New Year! 🚀

Address

Miami, FL
33193

Website

Alerts

Be the first to know and let us send you an email when DAAB ConTech posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share