10/12/2026
Smart Septic is all over! Working on a sewer line replacement in Hudsonville today.
We got it all dug up, pipe re bedded, and backfilled. Tomorrow, we will get the driveway section backfilled with some fresh 21AA to prepare for a hot patch asphalt that will be done on Wednesday morning.
This was a challenging job. When the tank was installed, there was very minimal slope put on the pipe so each section of pipe had to be installed almost perfectly to ensure a downward slope, but to not use too much slope, too quickly.