09/30/2026
This wetter than normal summer has kept us busy with ditch work and erosion control!
We cleaned up the discharge side of these culverts, removing built up material and vegetation to improve the waterway. We also cleaned up and restored the surrounding area with rip rap to help control bank erosion.
Before and after pictures.
Hesson Dirt Works
Excavation
Drainage
Grading
Site Prep