Anchor Helical Foundations

Anchor Helical Foundations Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Anchor Helical Foundations, Contractor, 12026 Lake Lane, Lindstrom, MN.

Helical piers were a perfect foundation solution for a deck addition to a cabin that sits near the lake.
04/12/2022

Helical piers were a perfect foundation solution for a deck addition to a cabin that sits near the lake.

Meet the team!  We are a Minnesota-based small business. Jose has been a certified heavy machine operator since 1998. He...
04/12/2022

Meet the team! We are a Minnesota-based small business. Jose has been a certified heavy machine operator since 1998. He has been working in construction and masonry for residential and commercial buildings for 12+ years. Because of his skill sets, he can meet needs beyond foundation installation alone.

Working on the edge and in confined spaces to install the foundation for this deck addition.
04/12/2022

Working on the edge and in confined spaces to install the foundation for this deck addition.

The Process  # Anchor Helical Foundations
04/12/2022

The Process # Anchor Helical Foundations

Making progress! This all-season porch is coming together.
04/12/2022

Making progress! This all-season porch is coming together.

Installing the foundation for this all-season porch was a breeze in such lovely fall weather.
04/12/2022

Installing the foundation for this all-season porch was a breeze in such lovely fall weather.

This wrap-around porch and renovation called for double helix piers to meet the load bearing requirements
04/12/2022

This wrap-around porch and renovation called for double helix piers to meet the load bearing requirements

04/12/2022
04/12/2022
To meet the working load, this job required double helix leads with multiple extensions in order to reach over 30 feet d...
04/12/2022

To meet the working load, this job required double helix leads with multiple extensions in order to reach over 30 feet deep. Later, a construction team came to pour cement and put up walls.

The required working load was not met until we hit bedrock when installing these piers. Unable to drill any further, the...
04/12/2022

The required working load was not met until we hit bedrock when installing these piers. Unable to drill any further, the top of the piers containing the quick connect had to be cut off in order to meet the height specifications. An acetylene torch and high power drill were used to punch new holes to attach the new construction bracket.

On this job, we ran into a layer of frozen rocky soil that required drilling with a jackhammer to make it through
04/12/2022

On this job, we ran into a layer of frozen rocky soil that required drilling with a jackhammer to make it through

Address

12026 Lake Lane
Lindstrom, MN

Alerts

Be the first to know and let us send you an email when Anchor Helical Foundations posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category