05/28/2026
Had lots of fun hanging out in this crawlspace to complete a small structural repair under a bathroom. Three of the floor joists were rotted and hanging out with no support. We sistered on new treated joists, poured two concrete pads, built a treated double 2x8 beam with 4x4 posts & jacked the floors up to level.