08/31/2026
This project started with removing an old tub/surround that were never installed correctly. We rebuilt the whole thing: new subfloor, framed a wall for a 48” shower, & used self-leveling to fix a floor that was 1” out of level over just 34”. Installed a new shower base/drain, replumbed the drain line, & ran new plumbing for the mixing valve, shower arm, & hand sprayer. Finished it off with a brand new acrylic surround, shower trim, & glass shower door. Studs to finish — built to last.