Quality Buildings LLC

Quality Buildings LLC Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Quality Buildings LLC, 2562 Steelton Road, Lancaster, PA.

02/05/2026

Compared to steel and concrete, CLT is up to 75% lighter—which can significantly reduce foundation requirements and overall structural cost.

Because CLT is manufactured offsite, construction is less impacted by cold-weather conditions and on-site sequencing constraints. The result is shorter on-site durations, fewer weather delays, and more predictable schedules.

Lighter structures. Faster installs. Better schedule control.

This is why CLT continues to gain momentum on complex, schedule-sensitive projects.

02/03/2026

The People Behind the Build | Scott Charney

Mass timber success starts long before materials are ordered or crews mobilize.

Scott Charney, QB's Mass Timber Market Manager, works with owners, designers, and construction teams during design-assist and preconstruction. He helps turn early questions into clear, executable plans that protect schedule and cost downstream.

This is what building with certainty looks like.

🌟Project Update | Colby CollegeTimber stair towers are being set on site at Colby College, marking an important mileston...
01/30/2026

🌟Project Update | Colby College

Timber stair towers are being set on site at Colby College, marking an important milestone in the build.

QB Timber Towers are prefabricated structural systems designed to bring strength, schedule certainty, and efficiency to multi-story projects.

CLT mass timber towers are a competitive alternative to concrete masonry and are innovating commercial prefab buildings.

That time QB picked up shovels to keep the job moving. ❄️During construction of The Nines Apartments in downtown Allento...
01/29/2026

That time QB picked up shovels to keep the job moving. ❄️

During construction of The Nines Apartments in downtown Allentown, winter delivered a snowstorm with up to 18 inches of accumulation—right as the building was going vertical. Sound familiar?

“Even though snow removal was not part of the QB scope of work, they diverted manpower to keep the project moving forward on schedule.”
— Robert DiLorenzo, Senior Project Manager, City Center Investment Corporation

Snow removal became part of the work—the part that kept momentum going.

Advanced planning, early coordination, and off-site prefabrication allowed the project to move smoothly from floor to floor, even under winter conditions.

When the storm hit, the team cleared access and kept work progressing, supported by just-in-time deliveries of prefabricated wall panels manufactured offsite.

Sometimes it looks like leadership in the field—and a shovel or two.

Read the full project highlight here: https://lnkd.in/gwvBCWFZ

01/24/2026

This month, we’re proud to recognize Jen Howard, Operations & Safety Specialist, as a Timber Tokens Culture Contributor for exemplifying our core values of Care and Solutions-Driven.

Jennifer’s work goes far beyond policies and procedures. She focuses on helping people truly understand safety expectations, company guidelines, and project realities — while showing up for our team consistently, day or night. Her approach makes it clear that at QB, no one is ever “just a number.”

By supporting our field staff, solving problems, and helping teammates navigate challenges with empathy and clarity, Jennifer strengthens our culture from the inside out.

Congratulations, Jen — and thank you for the care you bring to our people and our work.

⭐️ Celebrating the people who build our culture.

More Timber Tokens spotlights coming monthly.






01/22/2026

🌟The People Behind the Build

Before materials are ordered or schedules are finalized, there’s a critical phase where decisions set the tone for everything that follows.

Bob Dressler, Chief Estimator at Quality Buildings, works at that point in the process — helping teams align scope, cost, and constructability early through design-assist and preconstruction.

By supporting owners, construction managers, and design teams with clear pricing logic and disciplined quantity takeoffs, Bob helps reduce uncertainty and support informed decision-making.

His work happens early, but its impact carries through the entire build.

Good projects start with the right people involved early...follow along as we share more of the People Behind the Build.







01/19/2026

Proud to support Lancaster Lebanon Habitat for Humanity on this project in Columbia, PA.

This 13,000 sq. ft. building will provide 5 new homes—designed to support affordable housing through thoughtful, efficient construction.

QB is providing the prefabricated framing package, helping streamline the build process while supporting quality, safety, and predictability in the field.

Projects like this are a reminder that how we build matters—especially when the goal is strengthening communities.

Got a framing project in the works? Evan Rineer can help.

When consulting, design, supply, and install operate as one coordinated system, projects gain predictability — even in a...
01/16/2026

When consulting, design, supply, and install operate as one coordinated system, projects gain predictability — even in a labor-constrained environment.

Design | Supply | Install

That’s how we help teams build with confidence and certainty.

Reach out and we'll be happy to walk through how this approach works on real projects:

www.qualitybuildings.com

⭐️Throwback Project Highlight: 40TEN | Baltimore, MDBefore mass timber became mainstream, projects like 40TEN helped set...
01/12/2026

⭐️Throwback Project Highlight: 40TEN | Baltimore, MD

Before mass timber became mainstream, projects like 40TEN helped set the standard.

Completed in 2023, 40TEN, 4-story, a 105,000 SF office building, is Baltimore’s first modern mass timber office building and a key component of The Collective, a mixed-use development by 28 Walker in the Canton neighborhood.

QB was proud to perform the mass timber installation, bringing precision, sequencing, and field ex*****on to a project that helped prove mass timber’s viability in an urban office environment.

Now featured on the WoodWorks Innovation Network (WIN), 40TEN remains a strong example of how thoughtful design, structural clarity, and expert installation come together to deliver modern timber construction at scale.
Projects like this paved the way for what’s now possible in mass timber.

Check out the full project overview here on the WIN Network: https://lnkd.in/gTh4Kgih

New Project Alert: Heck Avenue Supportive HousingSq. Ft. – 101,410 - UnitsGC – C&C Construction ManagementLocation – Nep...
01/05/2026

New Project Alert:
Heck Avenue Supportive Housing

Sq. Ft. – 101,410 - Units

GC – C&C Construction Management

Location – Neptune, NJ

Type – Affordable Multifamily Apartments

Start Date – Dec. 2025

Role – QB Pre-Fab Framing Package

01/02/2026

We’re proud of what was accomplished in 2025—and grateful for the customers, collaborators, and Quality Buildings team members who made it possible.

Here’s to building with purpose and momentum in the year ahead.
Ready for a strong 2026.

Address

2562 Steelton Road
Lancaster, PA
17601

Alerts

Be the first to know and let us send you an email when Quality Buildings LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Quality Buildings LLC:

Share