What does the prep work actually consist of?
Before a single drop of coating touches your floor, there’s a full process that has to happen first—and it’s the part most people never see.
We begin by inspecting the concrete and protecting the surrounding space. Plastic sheeting goes over doors, cabinets, belongings, and anything else that needs to stay clean. Equipment only comes in once the space is protected and the work area is ready.
From there, we diamond-grind the main field of the floor to remove weak surface material, old coatings, and surface contaminants while opening the concrete to create the proper profile for the new system to bond to. The perimeter is then edge-ground separately so nothing gets missed along walls, corners, doorways, and other tight areas the larger grinder cannot reach. Cracks, divots, spalled areas, and other damaged sections are repaired as needed and ground flush with the surrounding concrete. Those repairs are not just cosmetic—they help create a sound, even surface before the coating system is installed.
Once the grinding and repairs are complete, the floor is thoroughly vacuumed and cleaned. Every bit of concrete dust, loose material, and grinding residue has to be removed because anything left behind can interfere with the bond. The edges are then masked cleanly, the mix station is set up, and every roller, squeegee, bucket, and material is staged before we ever open a coating kit.
That sequence isn’t optional, and it isn’t negotiable. Every step exists because skipping one creates a problem downstream. After 19 years and more than 2 million square feet installed, we’ve seen exactly what happens when prep gets rushed.
The coating is the part you see. The prep is the part that makes it last.