RSC Building

Call Website Contact the business

RSC Building We are passionate about everything building.

With a solid foundation in education, we are dedicated to advancing the construction industry through innovation, sustainability, and expert knowledge.

10/21/2026

Before the walls go up, the frame has to come together. These large timber sections are called bents. This one was hand-cut by Vermont Frames and is ready for the next step: adding SIP panels to enclose the structure.

BuildingProcess Craftsmanship

It's not every day you get to see craftsmanship like this up close!From the impressive exposed timber beams to the detai...
10/19/2026

It's not every day you get to see craftsmanship like this up close!

From the impressive exposed timber beams to the detailed framing throughout, this home is really starting to take shape.

Our crew has been busy installing LVL headers, framing garage door openings, and making sure every measurement is right. Meanwhile, has been bringing the timber structure together, creating a beautiful contrast between the natural woodwork and the surrounding Vermont landscape.

We're looking forward to seeing this one continue to come together!

10/15/2026

A quick site update: the timber frame is taking shape, and temporary safety rails are in place along the open edges. With a walkout basement and a significant drop-off at the back, keeping the site safe is part of the work at every stage.

10/13/2026

It’s always a good day when there’s a crane on site, especially when a timber frame is going up. This frame was cut for our project by Vermont Frames it’s exciting to see it take shape.

10/09/2026

This strap anchor helps tie the framing to the sill plate, adding strength where the structure meets its foundation. It’s a small detail that can make a big difference when strong weather rolls through.

Have you seen one of these on a job site?

10/07/2026

Squash blocks help transfer the weight of the timber frame down through the structure, creating a continuous load path. Here’s a closer look at how this detail comes together on site.

JobsiteProgress CustomHomeBuilding

On this project, we’re making progress both above and below ground. 🍂We’re spreading topsoil around the property, which ...
10/06/2026

On this project, we’re making progress both above and below ground. 🍂

We’re spreading topsoil around the property, which creates the nutrient-rich layer needed for future grass and landscaping. We’re also installing an underground propane tank, which will store fuel for the home, and digging a trench for the fuel line that connects it to the house.

For the driveway, we’re spreading and compacting gravel, pressing it firmly into place to create a strong, stable surface that can handle vehicles and hold up over time.

It’s all part of getting the exterior of this home one step closer to finished!

10/01/2026

What are squash blocks, and why are they in the floor framing? They help transfer the load from the timber beam down through the structure, giving that weight a clear path to the support below.

A small detail doing an important job. Had you heard of squash blocks before?

BuildingInVermont BehindTheBuild

Crazy how much a project can change in just one week.The floor system has come a long way, with sheathing going down, jo...
09/30/2026

Crazy how much a project can change in just one week.

The floor system has come a long way, with sheathing going down, joists and blocking getting dialed in, and the mudroom and garage areas really starting to take shape. There’s been a lot happening behind the scenes too, from checking levels and straightening joists to sealing sill plates and making sure everything is ready for the next phase.

Now we’re getting into one of the most exciting parts of the build. The timber frame is starting to take shape, and it’s completely changing the feel of the project. Huge shoutout to for their work bringing this part of the build together. It’s always cool seeing what was on the plans start becoming the real thing.

Another big week of progress in the books. Can’t wait to see where we are a week from now.

This project is just about wrapped up, and we must say, it is a looker 👀The last stretch was all about bringing everythi...
09/29/2026

This project is just about wrapped up, and we must say, it is a looker 👀

The last stretch was all about bringing everything across the finish line. The crew finished up the flooring, baseboards and door casings, completed the stair railings, trimmed around the track lighting, installed the screen door and worked through the final punch list.

From there, it was touch-ups, cleaning windows and beams, polishing the glass, installing screens and getting the space ready for the final walkthrough with the homeowners.

We love how this one came together, especially the exposed wood, triangle windows and all that natural light. Just a few final details left!

VermontHomes FinishCarpentry CustomCarpentry HomeRenovation BuildingVermont VermontContractor

Address

65 Ethan Allen Road
Jericho, VT
05465

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+18028815033

Alerts

Be the first to know and let us send you an email when RSC Building posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to RSC Building:

Shortcuts

Share