Pouring the garage floor in Newfields this morning
05/27/2026

Pouring the garage floor in Newfields this morning

All the rough in inspections passed and  the siding is going on at the ADU in East Kingston, insulation is done and shee...
05/26/2026

All the rough in inspections passed and the siding is going on at the ADU in East Kingston, insulation is done and sheetrock is hung.
Excavation is being completed , epoxy floor went down, stonework is underway at the garage on Thunder Road today.

We are off to the Garden tonight for a Memorial Day show to remember !!
05/24/2026

We are off to the Garden tonight for a Memorial Day show to remember !!

Told you this wouldn't take long...
05/19/2026

Told you this wouldn't take long...

Framers started the detached home office in Newfields this morning. With 5 guys this wont take long...
05/18/2026

Framers started the detached home office in Newfields this morning. With 5 guys this wont take long...

Slab and frost posts for the home office are poured, inspected and backfilled. Lumber is there and ready for framers whe...
05/14/2026

Slab and frost posts for the home office are poured, inspected and backfilled. Lumber is there and ready for framers when the rain is over.

Plumbing is done and rough wiring is underway at the ADU . HVAC comes in on Thursday.
05/12/2026

Plumbing is done and rough wiring is underway at the ADU . HVAC comes in on Thursday.

The roofing and framing are completed at the ADU.The sheetrock is done and siding is almost completed, just the front ga...
05/07/2026

The roofing and framing are completed at the ADU.
The sheetrock is done and siding is almost completed, just the front gable to finish at the garage in Fremont.
The steel posts were put in for the stairway in Newfields and plumbing and wiring are well underway. The foundation for the office is in , drains done and ready for inspection.

05/01/2026

The final wall going up at the ADU

05/01/2026

The final wall going in place with the help of the crane.

Address

28 Wellington Drive
Hampstead, NH
03841

Website

Alerts

Be the first to know and let us send you an email when Daniel Perry Builders LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Daniel Perry Builders LLC:

Share