06/02/2026
Project #3
I’ve been working on this project for the past 2 mos. and it’s just now beginning to take shape. This project has required additional beams installed to lift up a sagging original deck/dining room as well as posts being removed to allow access below screened porch. In addition partition walls were added to conceal the many posts that were previously added to support the 2-story additions. Existing patio structure was removed and a new structural deck is being framed. We will be installing a waterproof membrane below a concrete tile deck system. Follow to see the finished product.