06/17/2026
⭐️Lagoon Rehabilitation and Liner Replacement Project Update⭐️
TW&M LLC crews are dewatering the existing lagoon, removal of accumulated sludge and sediment, demolition of existing drainage infrastructure, subgrade remediation, installation of new underdrain piping, liner repairs/replacement, grading, testing, and restoration of the containment basin for future service.👷🏻♂️
✅Removal of existing drainage piping.
✅Demolition of deteriorated collection system.
✅Exposure of basin floor for reconstruction.
✅Excavation around collection trenches.
✅Preparation for installation of new perforated drain pipe and aggregate.
If you need any of our services please call us‼️
📞(806)250-3669