08/04/2026
📍Brighton at Bay Colony in Pelican Bay.
Our crews helped transform an aging pool and entry deck by taking it all the way back to the structural deck and rebuilding it from the ground up.
Our scope included:
• Demolition of existing concrete, planter walls, pergolas, and waterproofing
• Construction of new lightweight concrete topping slabs
• New planter walls, curbs, sidewalks, stairs, and structural concrete
• Careful grading and sloping to direct water toward drainage systems
• Preparing the site for the beautiful finishes you’ll see today
Construction is about far more than pouring concrete. Every finished space depends on the work that happens beneath the surface.
🤝Huge thank you to our field crews and to Walker Contracting Group for the opportunity to be part of another incredible project.