This project had a combination of a deadline and multiple loose ends — the homeowner had already been let down once. Another contractor left mid-project: kitchen ceiling was left open with insulation hanging down, bathroom shower incomplete with partially installed cement board.
They reached out looking for someone who could finish what was started, and get it done before their family arrived for Fourth of July.
Swipe through to see where it started and where it landed.
Drywall is hung and finished in the kitchen and hallway, the shower is now finished, high gloss porcelain tile, double niches with rain shower heads. Pretty frickin sweet.
If you’ve got a project that’s stalled out, or you just want it done right the first time, send me a message.