Floyd Brickhouse Construction

Contact the business

Floyd Brickhouse Construction Residential/ Commercial Building Contractor. Where honesty and quality is the only option.
(1)

It’s that time…at the Muddy Creek project
10/15/2026

It’s that time…at the Muddy Creek project

Rough in inspections are complete at the Muddy Creek project. It’s insulation time…
10/13/2026

Rough in inspections are complete at the Muddy Creek project. It’s insulation time…

We got the Muddy Creek project all dried in. We’ll be putting some shingles on Monday if the weather holds out.
09/18/2026

We got the Muddy Creek project all dried in. We’ll be putting some shingles on Monday if the weather holds out.

It was a warm one today but the guys got the porches poured. Hopefully we’ll get those framed up next week. Thanks Cecil...
09/03/2026

It was a warm one today but the guys got the porches poured. Hopefully we’ll get those framed up next week. Thanks Cecil for jumping in at the last minute.

The Muddy Creek project is moving right along. The hero and his crew helped us set the trusses and sheath the roof. We h...
08/26/2026

The Muddy Creek project is moving right along. The hero and his crew helped us set the trusses and sheath the roof. We have paper on the roof so we’re mostly dried in.

View of the day…Jr’s building up courage 😂😅🤣
07/17/2026

View of the day…Jr’s building up courage 😂😅🤣

Got this slab down at the Muddy Creek project this morning. Going to get the septic system knocked out tomorrow. Then we...
07/14/2026

Got this slab down at the Muddy Creek project this morning. Going to get the septic system knocked out tomorrow. Then we can do a little grading and hopefully make it nice to walk around again

The boys knocked it out this morning, heat and all. Rough in done by noon…
07/03/2026

The boys knocked it out this morning, heat and all. Rough in done by noon…

Waiting on a foundation inspection at the Muddy Creek project
06/23/2026

Waiting on a foundation inspection at the Muddy Creek project

Footing is poured…heat and all
06/17/2026

Footing is poured…heat and all

Address

1502 Darian Drive
Elizabeth City, NC
27909

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Floyd Brickhouse Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Floyd Brickhouse Construction:

Shortcuts

Share

Category