06/11/2026
Today I installed the dishwasher and then reinstalled the insulation in the basement ceiling where I put in a new 2” drain pipe for the kitchen sink and up flush toilet. Then I put the last coat of joint compound in the stair area. After that I removed the plaster board off both sides of the wall that going to be removed and replaced with a beam. And clean up the area.