Bostle & Son Remodeling

Bostle & Son Remodeling General contractor specializes in interior residential remodeling bathrooms, kitchens, basements..

Client wanted to upgrade her old fireplace so we did just that will install the fireplace insert tomorrow have 12 days l...
08/14/2026

Client wanted to upgrade her old fireplace so we did just that will install the fireplace insert tomorrow have 12 days left of curing and will be staining the concrete hearth a mocha brown this turned out amazing..!!

Quartz countertops are installed with waterfall sides getting close to wrapping this project up. We’re gonna get the bac...
08/03/2026

Quartz countertops are installed with waterfall sides getting close to wrapping this project up. We’re gonna get the backsplash set and grouted  get the crown installed and handles the appliances in place just waiting on the sink because the one we have was damaged in transit so they sent us a replacement should be here this week and she will have her kitchen back very soon

Just so you know we offer financing options as well.! We also except major credit cards(with fee) so if your budget is t...
08/03/2026

Just so you know we offer financing options as well.! We also except major credit cards(with fee) so if your budget is tight and you’re wanting or needing some work done we have options for you.!

Concrete hearth poured today turned out real good little touch up on Monday let it dry out realGood and she’s getting st...
07/31/2026

Concrete hearth poured today turned out real good little touch up on Monday let it dry out real
Good and she’s getting stained gonna start on tile Monday or Tuesdays this this wrapped up

Builtin fireplace all framed up the forms for the concrete hearth are all done We’re gonna pour the hearth tomorrow let ...
07/30/2026

Builtin fireplace all framed up the forms for the concrete hearth are all done We’re gonna pour the hearth tomorrow let it cure so we can stain it get our ban let board hung so we can get started on the tile I can’t wait to show you guys this when it’s done..!

Quick little weekend engineered hardwood job over the weekend we put shoe molding up and transitions too but forgot to t...
07/19/2026

Quick little weekend engineered hardwood job over the weekend we put shoe molding up and transitions too but forgot to take pics when all the way finished

We’re hiring..!! Have a few positions available looking for someone with experience to lead a crew preferably with bathr...
06/28/2026

We’re hiring..!! Have a few positions available looking for someone with experience to lead a crew preferably with bathroom and kitchen remodeling experiences at least five years of experience competitive pay based upon what you know we do a lot of bathroom and kitchen remodels finishing basements will need to have basic plumbing, electrical knowledge, carpentry drywall painting tile be able to show up every day on time work eight hours will pay incentives and bonuses based on performance also in need of a helper I don’t need a lot of experience. Just have to be able to show up every day and be willing to learn and do what’s ask of you. We need to have some tools if you don’t have a lot right now it’s not a big deal but I will pay you good so you can start building your tools up as well have to have your own transportation to the job site every day work will always be in the tri-state area Monday through Friday 8 to 4 if you’re looking or know somebody who’s looking have them reach out to me 513-226-2203 look forward to building a solid crew have colonial work built up that it’s hard to get to with just my crew so need another accountable crew to start getting these jobs. Knocked out this is a 1099 position as of right now, but as things start growing, will work into starting a payroll 

Underground plumbing done now to keep pushing forward
06/19/2026

Underground plumbing done now to keep pushing forward

Got 120 sq ft of tile and 2” of self leveling tore up all the remaining walls and cut into the slab and busted it up tod...
06/18/2026

Got 120 sq ft of tile and 2” of self leveling tore up all the remaining walls and cut into the slab and busted it up today so we can get the plumbing ran tomorrow for this bathroom remodel we broke ground in today.!!

Started this last Monday it was severely outdated and was in need of a facelift. We did that six days later we brought t...
06/16/2026

Started this last Monday it was severely outdated and was in need of a facelift. We did that six days later we brought their dreams to reality. Deliver them a updated bathroom.. we installed 16 x32 marble looking porcelain tile installed a deep soak kohler tub install all new plumbing components new elongated toilet 2 can lights a new exhaust fan LED vanity mirror and life proof 30 mil LVP flooring with all new baseboard and casing they absolutely love it it turned out really well..! if you’re thinking about a renovation project feel free to reach out for a free consultation and estimate 513-226-2203

Address

Cincinnati, OH

Website

Alerts

Be the first to know and let us send you an email when Bostle & Son Remodeling posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category