04/14/2022
Time impact analysis is usually performed by a project scheduler and can be used on most construction projects. This method involves the insertion or addition of activities indicating delays or changes in a schedule representing progress up to the point when a delay event occurred.
A guide to performing a time impact analysis, which is used to determine the extent of possible delays in construction activities.