11/01/2025
Complete Bathroom Renovation
This bathroom went through a full makeover!
The original space was narrow and outdated, with old tiles, basic lighting, and worn-out finishes. We decided it was time for a complete renovation β from plumbing and flooring to paint and dΓ©cor.
π¨ Step 1: Demolition
We started by removing everything β the toilet, floor tiles, and wall coverings. Once the walls were open, we could inspect the plumbing and electrical systems to make sure everything was ready for an upgrade.
π° Step 2: Plumbing & Electrical Work
With the structure exposed, new water lines and wiring were installed to support better lighting and more efficient fixtures. The subfloor was leveled and prepped for the new materials.
π§± Step 3: New Finishes
Fresh tiles were laid, new fixtures were installed, and the space started to come to life. The goal was to create a clean, modern, and functional design.
π¨ Step 4: Final Touches
After painting the walls and adding a new light fixture, the finishing details β like dΓ©cor, accessories, and artwork β completed the transformation.
β¨ From outdated to refreshed and inviting β this bathroom is now ready for everyday comfort and style!