10/05/2026
47 retaining walls across 2.5 acres at Bachelor View. From the air it looks like a lot of dirt. Get closer and it's the water truck keeping the dust down, the dozer shaping the ground, the haul trucks moving every load, and an operator in the seat who reads the ground. The ground goes first, and everything built here depends on it. What part of the job do you want to see up close next?