Mr. Gao(高工)

Mr. Gao(高工) 🏗️ Senior Civil & Power Plant Construction Engineer. Documenting heavy rebar & structural works in China & overseas!

19/10/2026

Real construction scenes! Massive cover plate girder rebar tying and stirrup installation for China metro project. While Western countries often use precast concrete elements, China's cast-in-place heavy civil engineering delivers unmatched structural flexibility in urban areas! ⁠

18/10/2026

Real construction scenes! Massive bottom mat rebar tying and pile cap construction for China metro project. ⁠

17/10/2026

Amazing rebar splicing and fixing on site! Heavy metro circular steel-composite columns in China. ⁠

16/10/2026

Rebar fixing for heavy composite steel columns on massive metro construction in China Detailed process of column rebar installation on site

15/10/2026

Massive storage tank er****on and welding at a power plant site in Thailand Crane hoisting tank rings precision fit up alignment and heavy duty welding Real site industrial action for power infrastructure

14/10/2026

Massive metro cover beam construction in China We elevate bottom rebar on steel channels and the main purpose is to successfully sleeve huge stirrups into the heavy framework Real site engineering action

13/10/2026

Continuing our ongoing China subway construction series! Today we focus on heavy rebar fabrication at the project site plant.
Here is a close-up of a high-efficiency band saw machine, made in China, cutting through a bundle of 40mm steel bars. Watch the hydraulic clamping and the 100x timelapsed cutting process in action!

12/10/2026

Lately I have been sharing civil rebar work from China, but today let us head back to the Thailand power plant for classic boilermaker craft!
No high-tech shortcuts here—just welded lugs, tapered wedges, and heavy hammers to fix shell misalignments before seam welding. Pure field grit!

11/10/2026

On-site oxy cutting work for large metro steel column. The vi****or hole was not prefabricated, cutting 20mm thick steel plate in confined space. Heavy sparks during
operation.

10/10/2026

Super large metro main cover beam construction in progress. Ultra dense reinforcement layout. Workers finish inner stirrup binding inside the huge beam body.

Address

曼谷
Shanghai

Opening Hours

Monday 06:00 - 00:00
Tuesday 06:00 - 00:00
Wednesday 06:00 - 00:00
Thursday 06:00 - 00:00
Friday 06:00 - 00:00
Saturday 06:00 - 00:00
Sunday 06:00 - 00:00

Website

Alerts

Be the first to know and let us send you an email when Mr. Gao(高工) posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share