Abdullahi Aliyu

Abdullahi Aliyu Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Abdullahi Aliyu, Construction Company, Ungogo LG, Kano.

πŸ—οΈ Foresight Blocks Industry

Quality concrete blocks, interlocks & kerbs for durable construction and beautiful outdoor spaces.

πŸ“ Ungogo, Kano State, Nigeria
πŸ“ž 09035576213
πŸ“§ [email protected]

Quality you can build on. πŸ’ͺ

10/10/2026

Borehole mantainace

04/10/2026
04/10/2026

I love my country no matter what.....

04/10/2026

🚧 Drainage Line Survey & Construction

A drainage pipeline installation requires accurate surveying, excavation, level control, pipe laying, bedding, backfilling, and road restoration. Proper control of the invert level and gradient is essential to maintain gravity flow and prevent water stagnation.

πŸ”Ή Main Construction Steps

1. Surveying & Setting Out – Establish the drainage alignment, benchmarks, chainages, and manhole locations using a Total Station or other suitable surveying equipment.

2. Chainage & Invert Level Control – Mark required invert levels (IL) and maintain the designed longitudinal gradient.

3. Trench Excavation – Excavate to the required depth and width while maintaining safe trench conditions.

4. Sub-base/Bedding Preparation – Provide and compact suitable granular material beneath the pipe.

5. Pipe Installation – Lay RCP, uPVC, or HDPE pipes to the specified line, level, jointing system, and gradient.

6. Side Fill & Backfilling – Place suitable selected material around and above the pipe in controlled layers and compact properly.

7. Manholes – Provide manholes at changes in direction, changes in gradient, junctions, and appropriate intervals.

8. Road Restoration – Reinstate sub-base, base course, and asphalt/pavement to match the required road specification.

πŸ“ Important Design Checks

Confirm pipe diameter and hydraulic capacity from the design flow.

Maintain the specified minimum gradient.

Check trench width and pipe cover requirements.

Ensure adequate granular bedding and uniform support beneath the pipe.

Compact side fill and backfill in appropriate layers.

Verify pipe alignment and invert levels before backfilling.

Follow the applicable project specifications and local standards; the values shown in the illustration are typical guides, not universal design requirements.

⚠️ Safety

Deep trenches require proper assessment and protection against collapse, falling materials, water ingress, and plant movement. Use appropriate trench support/protection and maintain safe access and working clearances.

🏷️ Follow CIVIL Tech Time

Quantities
04/10/2026

Quantities

04/10/2026

Students football field

04/10/2026

Good evening All

Address

Ungogo LG
Kano

Website

Alerts

Be the first to know and let us send you an email when Abdullahi Aliyu posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share