JCB BIMs Sdn Bhd, a subsidiary of Kumkang Kind Malaysia, is a BIM consultancy supporting architects, engineers, contractors, and owners to plan, design, and manage projects with improved efficiency, accuracy, and sustainability.

You see the fixture.BIM sees everything it takes to make it work.From position and clearance to connection and coordinat...
24/09/2026

You see the fixture.
BIM sees everything it takes to make it work.

From position and clearance to connection and coordination—BIM turns what’s visible into what’s buildable.

你看见的是设备,
BIM看见的是让它顺利运作的每一个细节。

从位置、净空到连接与协调,BIM让设计真正落地。



www.jcbbims.com.my

Different strengths. One nation. One shared future. 🇲🇾JCB BIMS wishes all Malaysians a proud and meaningful Malaysia Day...
15/09/2026

Different strengths. One nation. One shared future. 🇲🇾
JCB BIMS wishes all Malaysians a proud and meaningful Malaysia Day!

多元的力量,同一个国家,共筑美好未来。🇲🇾
JCB BIMS祝全体马来西亚人民,马来西亚日快乐!

Don’t coordinate problems on site.Solve them before they get there.Swipe to see how BIM coordination turns complexity in...
11/09/2026

Don’t coordinate problems on site.
Solve them before they get there.
Swipe to see how BIM coordination turns complexity into buildable clarity.

别把问题留到施工现场。
通过BIM协调,提前发现、提前解决。
滑动查看BIM如何让复杂项目变得更清晰、更具可建造性。

A clash on screen is coordination.A clash on site is delay, rework and cost.Discover 5 ways BIM coordination builds bett...
03/09/2026

A clash on screen is coordination.
A clash on site is delay, rework and cost.
Discover 5 ways BIM coordination builds better projects—before construction begins.

屏幕上的碰撞,可以提前协调;
现场中的碰撞,却会造成延误、返工与成本。
查看BIM协调如何在施工前,打造更高效、更具可建造性的项目。

Selamat Hari Merdeka from JCB BIMS.As Malaysia continues to grow and move forward, we believe that smarter design and be...
30/08/2026

Selamat Hari Merdeka from JCB BIMS.

As Malaysia continues to grow and move forward, we believe that smarter design and better coordination can help shape a stronger built environment for the future.

May this Merdeka remind us to keep building with purpose, unity, and progress.
Happy 31st August, Malaysia.

JCB BIMS 祝大家国庆日快乐。

随着马来西亚持续发展与前进,我们相信更智慧的设计与更好的协调,能够共同塑造更强大的未来建筑环境。

愿这个国庆日提醒我们继续以目标、团结与进步的精神,一起建设更好的马来西亚。
马来西亚国庆日快乐。

#马来西亚国庆日

It fits in the ceiling, but can it be maintained later?In BIM coordination, we do not only check whether the equipment c...
25/08/2026

It fits in the ceiling, but can it be maintained later?

In BIM coordination, we do not only check whether the equipment can fit into the space. We also need to consider whether technicians can access, service, remove, or replace the equipment after installation.

A unit may look perfectly placed in the model, but if the access is blocked or the maintenance clearance is too limited, it can lead to future rework, downtime, and higher maintenance cost.

Good coordination is not only for construction.
It also supports the people who need to maintain the building later.

Fit is not enough. Access matters.

设备放得进天花空间,但以后真的维修得到吗?

在 BIM 协调中,我们不只是检查设备能不能放进空间里,也需要考虑安装之后,技术人员是否能够接近、维修、拆除或更换设备。

一个设备在模型里看起来可能摆放得很完整,但如果维修通道被阻挡,或维修空间不足,后期可能会造成返工、停机时间增加,以及更高的维修成本。

好的协调不只是为了施工阶段。
也应该考虑建筑后期的维修和使用。

放得下,不代表维修得到。

Can you relate?Sometimes “just make it fit” sounds simple, until site installation, maintenance access, ceiling height, ...
20/08/2026

Can you relate?
Sometimes “just make it fit” sounds simple, until site installation, maintenance access, ceiling height, and coordination issues come into the picture.
In BIM, fit is only the first check.
A good coordination process also considers buildability, access, sequence, and future site impact.
Because if it only fits in the model, it may still become a problem on site.
Fit is not coordination.

你也遇过这种情况吗?

有时候一句 “just make it fit” 听起来很简单,直到现场安装、维修空间、天花高度和协调问题全部出现。

在 BIM 里,“放得下” 只是第一步。
好的协调过程,还需要考虑可建性、维修空间、施工顺序,以及后续可能带来的现场影响。

因为一个东西在模型里放得下,不代表它在现场就不会出问题。

www.jcbbims.com.my

10/08/2026

Before a project reaches site, the details need to be studied, checked, and coordinated.
At JCB BIMS, every model goes through a process of review, discussion, and technical coordination to help project teams identify possible issues earlier.
From model development to coordination review, our focus is to make construction clearer, more organised, and more buildable.
Find it earlier. Solve it smarter.

项目正式进入现场之前,所有细节都需要被研究、检查和协调。
在 JCB BIMS, 每一个模型都会经过审查、讨论和技术协调的过程,协助项目团队更早发现潜在问题。
从模型建立到协调审查,我们的重点是让施工过程更清晰、更有组织,也更具可建性。
更早发现问题,更聪明地解决问题。
#模型建立 #施工过程 #细节

Not every BIM detail starts as a full building model.Sometimes, it starts from one small component like a sprinkler head...
04/08/2026

Not every BIM detail starts as a full building model.
Sometimes, it starts from one small component like a sprinkler head.
In BIM, even a small family needs to be created with the right size, connection, and placement, because it may affect ceiling layout, MEP coordination, and site installation later.
Small component, but important coordination value.
Every detail matters before it reaches site.

并不是每一个 BIM 细节,都是从完整的建筑模型开始的。
有时候,它是从一个小小的构件开始,比如一个 sprinkler head。
在 BIM 中,即使是一个小型 family,也需要根据正确的尺寸、连接方式和安装位置来建立,因为它可能会影响天花布局、MEP 协调,以及后续的现场安装。
小小的构件,也有重要的协调价值。
每一个细节,都应该在进入现场之前被认真检查。

Scan-to-BIM is a simple way to turn real site conditions into a usable digital model.First, the existing building or sit...
23/07/2026

Scan-to-BIM is a simple way to turn real site conditions into a usable digital model.
First, the existing building or site is captured using laser scanning. The scan creates point cloud data, which acts like a highly accurate 3D reference of what is actually there. From there, BIM modellers convert the scan into proper BIM elements that can be reviewed, coordinated, and modified.
This is especially useful for renovation, as-built records, project coordination, and facility management.

Scan-to-BIM 是把真实现场情况转换成可使用数码模型的过程。
首先,通过激光扫描捕捉现有建筑或现场情况。扫描后会形成点云数据,就像一个高精度的3D现场参考。之后,BIM建模人员会根据点云数据建立 BIM元素,让模型可以被查看、协调和修改。
Scan-to-BIM特别适合用于翻新工程、竣工模型、项目协调和设施管理。

#建筑信息模型 #点云数据 #激光扫描 #竣工模型 #数码建造 #建筑协调 #设施管理

Address

B-9-15 Block B, Oasis Square
Petaling Jaya
47301

Opening Hours

Monday 08:00 - 05:00
Tuesday 08:00 - 05:00
Wednesday 08:00 - 05:00
Thursday 08:00 - 05:00
Friday 08:00 - 05:00

Telephone

+601116609438

Alerts

Be the first to know and let us send you an email when JCB BIMS posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to JCB BIMS:

Shortcuts

Share