12/08/2012
Architecture(Akashi Kaikyō Bridge)
Main supporting towers
The bridge has three spans. The central span is 1,991 m (6,532 ft), and the two other sections are each 960 m (3,150 ft). The bridge is 3,911 m (12,831 ft) long overall. The two towers were originally 1,990 m (6,529 ft) apart, but the Great Hanshin earthquake on January 17, 1995, moved the towers so much (only the towers had been erected at the time) that the span had to be increased by 1 m (3.3 ft).
The bridge was designed with a two hinged stiffening girder system, allowing the structure to withstand winds of 286 kilometres per hour (178 mph), earthquakes measuring to 8.5 on the Richter scale, and harsh sea currents. The bridge also contains pendulums that are designed to operate at the resonance frequency of the bridge to dampen forces. The two main supporting towers rise 282.8 m (928 ft) above sea level, and the bridge can expand because of heat by up to 2 m (7 ft) over the course of a day. Each anchorage required 350,000 tonnes (340,000 long tons; 390,000 short tons) of concrete. The steel cables have 300,000 kilometres (190,000 mi) of wire: each cable is 112 centimetres (44 in) in diameter and contains 36,830 strands of wire.
The Akashi-Kaikyo bridge has a total of 1,737 illumination lights: 1,084 for the main cables, 116 for the main towers, 405 for the girders and 132 for the anchorages. On the main cables three high light discharged tubes are mounted in the colors red, green and blue. The RGB model and computer technology make for a variety of combinations. Currently, 28 patterns are used for occasions as national or regional holidays, memorial days or festivities