Most construction delays don't start on-site — they start with decisions that were left unresolved before the first brick was laid.
The pattern is consistent across almost every delayed project: soil testing skipped or ignored in the foundation design, approvals still 'in process' when work begins, structural drawings still being revised after the contractor has already mobilised. Each of these feels like a small shortcut in the moment and becomes a multi-week delay later.
The checklist we run through with every client before groundbreaking is deliberately unglamorous — soil reports, signed approvals, locked material specs, a genuine contingency budget, a clear contract, one point of design authority on-site. None of it is exciting. All of it prevents the expensive kind of surprise.
If you're planning to start construction in the next few months, save this and go through it line by line before you commit a date.