AC Heating

AC Heating Our company is engaged in the development, manufacture and installation of air to water heat
pumps with inverter technology and advanced xCC Controls.

An other update on our projects, we have this time completed installation of our renewable energy system in Banna beach ...
22/07/2016

An other update on our projects, we have this time completed installation of our renewable energy system in Banna beach holiday resort in lovely Co.Kerry
The system was installed in external building, replacing LPG fired boilers. The existing Air handling unit was replaced by a new energy efficient Dantherm dehumidifier.
As the project was completed two months ago we have been able to obtain first data of savings achieved by project.
The system is delivering heat energy for 83% less annual running cost.
If all leisure centres would be achieving this kind of savings ,Ireland would have no problems to achieve the 2020 CO2 savings target.

An other successfully completed project, Quality hotel leisure centre in Youghal Co. Corkhttps://www.facebook.com/search...
26/05/2016

An other successfully completed project, Quality hotel leisure centre in Youghal Co. Corkhttps://www.facebook.com/search/108678885829970/local_search?surface=sist
which was originally heated by Lpg Boilers. We have build an external boiler room in the container in our workshop. New boiler room was than delivered on the site , positioned on the roof of the leisure centre and connected to the existing hydraulics. We have changed swimming pool and whirlpool bath heat exchangers. The entire air handling unit was also changed for a new much more efficient dehumidifier made by Dantherm in Denmark.
The leisure centre temperatures of swimming pool , whirlpool bath , showers and pool hall are now controlled remotely by AC Heating technicians.

The leisure centre now operates on 25% of it's original heating cost.
By implementing energy efficient Air water heating system with advanced xCC building management controls from AC Heating, and installing a new Dantherm energy efficient air handling unit the following CO2 savings are achieved.
138,825 Liters of Lpg used by 90% efficient gas boilers would produce 231,129 Kg of CO2.
The new energy efficient heating system will use 155,817Kwh of electricity annually. This will produce 82,115 Kg of Co2 Annually.
Summary:

Annual Co2 Production prior installation of the energy efficient heating system: 231,129 Kg Annual Co2 Production after the installation of the energy efficient heating system: 82,115 Kg
Total Co2 Annual savings: 149,014 Kg
If the leisure center would be still producing 231,129 Kg of Co2 Annually, 1238 New pine trees would have to planted to absorb Co2 Emissions
If the leisure center uses 155,817 Kw of electricity annually instead of Lpg, 308 New pine trees would have to planted to absorb Co2 Emissions
Because of the fact the hotel is now using energy efficient heating system
930 less pine trees have to be planted annually.

Some updates on projects that we have completed in last couple months. We have completed number of project this year tro...
29/12/2015

Some updates on projects that we have completed in last couple months.
We have completed number of project this year trough "better energy community" scheme organised by Retrofit Ireland Ltd. and partly granted by SEAI.
One of the projects was heating system upgrades for number of Bernardo's Children's Charity buildings.The existing natural gas boilers where decommissioned and replaced by our energy efficient air source heating and building management system.
Both buildings ( the brighter future centre in Cork and Bernado's Mulhuddart in Dublin) are now heated on constant temperature , giving kids and staff much better comfort for fraction of the running cost. Our engineers constantly monitoring and adjusting temperatures to achieve maximum comfort and efficiency.
Because of the SEAI support there was a minimum capital cost needed to install the system.
This definitely is by our opinion good practice to implement renewal energy systems, reduce co2 emissions and achieve 2020 co2 reduction target.
Bellow some pictures from the installations.

Some updates for our audience!!!AC Heating has won an energy supply contract with Dublin city council to supply heat to ...
03/12/2015

Some updates for our audience!!!
AC Heating has won an energy supply contract with Dublin city council to supply heat to Cromcastle apartments for 7.5 Years. The whole project consists of 8 no. Apartment blocks, build in 1976 with 16 apartments in each block. Total of 128 apartments.
The system on each block consists of 2 x 28Kw heat pumps and our xCC building management system. Each apartment will have its own thermostat to be able to regulate heat independently. Our technicians will have online access to monitor performance of the whole system as well as be able to monitor temperatures in each apartment. Whole estate will be disconnected from natural gas and it will be running solely on our renewable energy heating system.
We have been working hard on the project last couple of months and we are delighted to announce that the project is now completed. The total combined output of heat pumps is 448 Kw.
Below some pictures from the project..

We have been very busy last couple months and did not get the chance to update our page. We have completed numb...
30/10/2015

We have been very busy last couple months and did not get the chance to update our page. We have completed number of bigger scale as well as smaller projects. Here are some examples.

Mountpleasent Lodge Nursing Home in Kildare
85 Beds nursing home. Heating distribution system - Radiators.
We have completed retrofit of our Air-Water heating and building management system. The new system now provides 98% of space and domestic hot water requirements.
Expected annual heating cost savings are estimated to 80% .
The running cost up to date since August 2015 is approximately € 1200 per Month compare to running cost of oil fired boilers previous year of € 5,458 per Month

We have also got some impressive feedback from a larger domestic job that we have completed last summer.Mistletoe Castle...
17/07/2015

We have also got some impressive feedback from a larger domestic job that we have completed last summer.
Mistletoe Castle in Youghal
A cascade system of 2 x 16 kw heat pumps was installed in June 2014 to heat 2500 sqft of underfloor heating on ground level which is split into two sections , each independently controlled by xCC control system based on the outdoor and indoor temperature, 14 cast iron radiators in second floor heat amounts also based on the outdoor and indoor temperature but higher heat gradients than underfloor heating, there is 5 more cast iron radiators in next two floors in the tower of the castle.
The whole castle is kept at 21- 23 Degrees in the living areas , 18 - 20 degrees in the bedrooms. The system also provides all domestic hot water requirements for kitchen and 5 bathrooms with baths and showers with rain shower heads.
The castle was not occupied for couple of decades and for the first time that has been heated fully throughout. It took a bid of effort to dry all of 2 ft tick dump walls and floors. The expected running cost of the heating system to provide heat and domestic hot water was €2,400 annually. After we took the reading of meters dedicated to AC Heating system this week, the running cost turned out to be: 14 800 Kwh per 14 months.
14,800 / 14 = 1057 Kwh average per month = 12,687 Kwh per Year @ 0.14 Cents per Kwh ( average between day and night rate) = Annual expenditure for all heating and domestic hot water = € 1776.00 including drying up the house.
That made the residence of the castle very happy customers over all !!!

Installation at Blainroe Lodge nursing home completed, an other business of the fossil fuels and achieving huge savings ...
17/07/2015

Installation at Blainroe Lodge nursing home completed, an other business of the fossil fuels and achieving huge savings on heating costs .
The nursing home is now heated solely by AC Heating heat pumps. All heat inputs and all zones are now controlled by our xCC building management system. Our engineers has full online access and system is being tuned up to achieve maximum comfort and efficiency.
We will keep you upgraded on the running cost and savings achieved in coming months.

An other energy efficient project currently being completed by Ac Heating at Blainroe Lodge Nursing Home. Our team curre...
17/06/2015

An other energy efficient project currently being completed by Ac Heating at Blainroe Lodge Nursing Home. Our team currently installing heating and building management system in stead of oil fired heat source. The total output of 112 Kw heat pumps with our xCC building management system will meet all heating and hot water requirements. An other business that will save greatly on heating bills( we will keep you upgraded) , turn green and reduce it's carbon foot print.
Congratulation blainroe Lodge !!!

An other project competed by AC Heating team. Park Hotel Dungarvan heating and domestic hot water was completed approxim...
15/06/2015

An other project competed by AC Heating team.
Park Hotel Dungarvan heating and domestic hot water was completed approximatelly a month ago.
A new renewable energy Air-Water heating system was installed to achieve more than 70% heating cost savings and give all Park hotel guests more comfort in winter months.
These works was done approximately 3 Years after AC Heating system installation on the Park hotel leisure centre.
A new Air handling unit installation was also completed on the leisure centre to give swimmers fresh and crisp air.
The Park hotel is now officially off fossil fuels,reducing greatly carbon footprint and helping the environment.
Congratulation Park Hotel !!!

AC Heating's location (G9) at The Energy Show 25-26th March 2015 in the RDS, Dublin
23/03/2015

AC Heating's location (G9) at The Energy Show 25-26th March 2015 in the RDS, Dublin

'The Energy Show 2015' ...    DON'T MISS IT!!AC Heating are attended The Energy Show 2015 in the RDS in Dublin next Wedn...
20/03/2015

'The Energy Show 2015' ... DON'T MISS IT!!

AC Heating are attended The Energy Show 2015 in the RDS in Dublin next Wednesday 25th & Thursday 26th of March.
Come and see our stand, we can give you information to take home and answer any questions you may have.

25th of March 10am - 6pm

26th March 10am - 6pm

Organised by SEAI, the annual Energy Show is the flagship event for professionals in the energy sector. This free two day event is a business only exhibition showcasing leading suppliers of sustainable energy products and services from Ireland and Europe.

Hi all our facebook friends, this week we'd like to share a project with you that we are installing at the moment. Abbey...
20/10/2014

Hi all our facebook friends,
this week we'd like to share a project with you that we are installing at the moment.
Abbey Court Hotel
It is a 85 bedroom hotel and Leisure Centre. We are sorting out all heating, domestic hot water, swimming pool, whirlpool bath and more.

Keep tuned in as we update you all in months to come with running costs and savings that will be made with our heat pump system.

Address

Unit 3 Westgate Business Park
Co. Waterford

Alerts

Be the first to know and let us send you an email when AC Heating posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to AC Heating:

Share