FROM TWO BEDROOMS TO ONE π
A fairly straightforward idea from the client β but there was quite a bit involved behind the scenes.
EACH JOB | Meticulously Executed
STEP BY STEP π
π¨ PLAN
Numerous calls & messages exchanged
Co-ordinated throughout the project
π§± ARW JOINERY
Stud wall removed between the two bedrooms, opening the space up and creating one larger bedroom.
π·ββοΈ DW ELITE PLASTERING SOLUTIONS
Once the joinery work was complete, our side began:
β’ 15mm plasterboarding
β’ Full preparation
β’ Floor protection
β’ Beading
β’ Fibre taping
β’ PVA where required
β’ Multi-Finish plastering
β’ Clean-up and finishing touches
Everything properly prepared before the plaster goes on β because the finish is only ever as good as the preparation underneath.
FAST FORWARD 2 WEEKSβ¦
And the transformation is complete.
One large, clean and seamless bedroom β ready for the next stage of the project.
Another job where the planning, preparation and teamwork behind the scenes makes all the difference.
A TEAM EFFORT π
Every job. Properly planned.
Meticulously executed.