A recently completed bathroom transformation project in Yarm.
We were asked to quote for this one several months back and pleased to say it was well worth the wait. The original bathroom which was had lasted 25 years and included a cast iron bath, I'm saying 300kg, not the easiest lift down the stairs on a Monday morning!
All walls completed in tile effect panels from MB DIY, as was the flooring which was a perfect contrast to the walls. A replacement wall hung sink was installed on the newly modified wall where the excessive boxing was removed. The sink pipework was adapted to run within the wall to ensure it wasn't visible.
A new reinforced bath with thermostatic mixer shower overhead complete with Grundfos shower pump took care of the poor flow rate.
A designer towel radiator was also installed to complete the finished room which now looks very fresh and modern.
Thanks to AWC Electrical for the installation of the downlights, illuminated mirror cabinet and fan. MB for the panels and flooring and of course Karl Rubberduck Bathrooms Ltd for everything else.
Onto the next one!