15/08/2026
Porch Project - Stage 1 Complete!
The team have been busy getting stuck into this porch project, and Stage 1 is now complete!
This stage involved excavating the area and relocating two drainage chambers to allow for the new concrete slab. During excavation, we discovered that both chambers had originally been installed incorrectly, one with 4 joints in a row someone must have run out of pipe! with leaks present at nearly every joint.
We repositioned the chambers, corrected the installation and ensured the drainage is now functioning properly.
The new concrete slab was then installed with two layers of reinforcement mesh spaced 50mm apart and a substantial concrete pour, providing a strong and durable foundation ready for the next stages of the porch build.
On to Stage 2!