SMG_Electrical

SMG_Electrical We are an electrical contractor based in Essex providing reliable high quality & reliable service to both Domestic & Commercial clients.

We cover both Essex & London, please feel free to contact us for more information or for a free quotation. We offer a wide range of electrical services, some of which are detailed below:

- Consumer unit upgrades.
- EICR's (Electrical safety reports or landlord reports).
- Fault finding.
- Full & partial rewires.
- Additional Sockets/lighting.
- External power and lighting.
- Security Lighting
- Summer House/Home office/garage wiring.
- Smoke alarm installation.

Recessed consumer unit upgrade recently completed. Had to swap out this old MK board due to multiple new circuits going ...
21/05/2026

Recessed consumer unit upgrade recently completed.

Had to swap out this old MK board due to multiple new circuits going in. Used the fusebox board with their flush mounting frame & was really pleased with the end result.

Luckily had enough length on all the cables.

Kitchen 2nd fix.Keeping all isolation points together in a cupboard is always our preferred way on a new kitchen, keeps ...
13/05/2026

Kitchen 2nd fix.

Keeping all isolation points together in a cupboard is always our preferred way on a new kitchen, keeps everything neat & tidy. This one also had some metal conduit for some additional sockets which made a change.

Driveway bollard lighting recently replaced and rewired. 💡The original bollards had been poorly wired and terminated, wh...
11/05/2026

Driveway bollard lighting recently replaced and rewired. 💡

The original bollards had been poorly wired and terminated, which led to water ingress and caused the SWA cable to begin failing.

We completely rewired the installation, surface mounting a Wiska box behind each bollard to ensure all connections remain accessible for future maintenance. Having a single flex at each bollard also made termination cleaner & easier.

⚡️

Consumer unit upgrade completed today following an unsatisfactory EICR. 3 boards now all in 1.
17/04/2026

Consumer unit upgrade completed today following an unsatisfactory EICR. 3 boards now all in 1.

Board changes for a landlord today from today using  boards. Peak & off-peak boards both replaced.
18/11/2025

Board changes for a landlord today from today using boards.

Peak & off-peak boards both replaced.

2  ceramic core electric radiators added to this garage conversion to finish it off today.Very easy to fit ✅ WiFi contro...
12/11/2025

2 ceramic core electric radiators added to this garage conversion to finish it off today.

Very easy to fit ✅

WiFi controllable & very easy to set up app ✅

Option to control multiple heaters at the same time using the app which is exactly what the client wanted to they can turn the heaters on without having to go outside and into the garage ✅

💡 Soffit lighting instal on a recent garage conversion using 8 of the Ansell Prism Pro mini downlights.Worked perfect fo...
07/11/2025

💡 Soffit lighting instal on a recent garage conversion using 8 of the Ansell Prism Pro mini downlights.

Worked perfect for the instal as a standard downlight would have been too bright. They fit through a 42mm cut out along with the driver which has got plenty of space for 2 x 1.5’s. They are also CCT selectable.


Garage conversion install finished off yesterday.Including power, lighting, Bluetooth ceiling speakers, smoke alarm & wa...
06/11/2025

Garage conversion install finished off yesterday.
Including power, lighting, Bluetooth ceiling speakers, smoke alarm & wall mounted TV.
Just waiting on the last two heaters to arrive before the space is fully complete.

First time using the speakers. Would recommend them, easy to fit & sound quality is spot on.

Lights
Sockets
Speakers


⚡️Consumer unit relocation & upgrade completed as part of the South London office refurbishment The original board was i...
24/07/2025

⚡️Consumer unit relocation & upgrade completed as part of the South London office refurbishment

The original board was in a completely inaccessible position and far too small for all the new circuits needed. We installed this 18-way consumer unit with built-in surge protection — giving us space to split circuits more effectively and minimise disruption if anything ever trips.

We also located the lighting joint box, Quinetic switch receivers, and emergency light test switches next to the board, keeping everything neat, accessible, and in one place

Following on from our previous post, this track lighting was also part of the same office refurbishment project.The clie...
17/07/2025

Following on from our previous post, this track lighting was also part of the same office refurbishment project.

The client wanted more of a feature lighting setup for one of the rooms and the entrance area. We opted for a 3-circuit track system, supplied by — suspended in the meeting room and surface-mounted in the entrance.

All track lighting is controlled via Quinetic switches for added flexibility.

We chose GU10 spotlights with honeycomb inserts and white bezels, offering a subtle alternative to the all-black fitting.

Address

Romford

Telephone

+447834777790

Website

Alerts

Be the first to know and let us send you an email when SMG_Electrical posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to SMG_Electrical:

Share

Category