20/10/2026
Moving onto the next detail on this project — the large entrance overhang.
We’ve been tasked with the design and installation of the metal soffit cladding, working the detail into the existing timber elevation and roofline.
The aim is a clean, simple finish that complements the timber cladding while tying back into the black metalwork already used across the building.
The soffit panels are being measured, detailed and formed to suit the structure on site, giving us the flexibility to deal with the geometry and junctions as the work progresses.
Still a little more to complete, but the contrast between the natural timber and black metalwork is working really well.
Designed • formed • installed by EGT.