Porcelain patio project
First, measure and mark the patio area. For a 25 m² patio, the exact shape determines the perimeter and number of cuts required. Levels should be established so rainwater drains away from the house. For a quality installation, the ground preparation and drainage are just as important as the porcelain itself.
The existing soil, grass or old paving is removed to the required depth the excavation needs to allow for the finished porcelain. A suitable MOT Type 1 sub-base is installed and compacted in layers. mortar bedding is installed over the prepared sub-base. The porcelain slabs are carefully positioned and bonded using full mortar beds & the correct priming slurry. We used lovely charcoal edging blocks to finish it off around the perimeter, we even installed a BBQ canopy! At MD Garden Design we cut no corners no project is complete until the client is satisfied with the results.