11/07/2026
So we was called back to Finnish phase 2 on this job after rip out and stoning up last year on phase 1 so we went with a full black band and the grey block these come in 3 sizes to make the patton look different all the way thru was a big project but got ther in the end lovely customers kept us fed and hydrated in this heat and it was all worth it in the end loved this job even tho it was a big one we smashed it with a 3 man team and look forward to the next one thanks for looking.
Hit share and like guys follow are page