Live Earth Neutral

Live Earth Neutral High End Residential Electrician

Still going strong.My Fluke T5-1000 — bought back in 2007 during the first year of my apprenticeship — has been with me ...
22/05/2026

Still going strong.

My Fluke T5-1000 — bought back in 2007 during the first year of my apprenticeship — has been with me through countless jobs, fault finds, installs, and long days on site.

A good tool earns its place over time.

Fresh replacement test leads fitted today. Simple upkeep for a meter that’s seen years of real work and still gets used regularly.
Some tools come and go. The reliable ones stay in the bag.





15/05/2026

Retrofitting intelligence into a 20-year-old heating system.

This full controls upgrade brings modern efficiency, reliability and precision comfort management into an established property — without compromising the existing infrastructure.

Underfloor heating manifolds now controlled via Heatmiser UH8 wiring centres and NeoStat V3 thermostats, delivering far greater zoning control, usability and energy management.

Hot water, towel rails and radiator circuits also fully upgraded and integrated as part of the wider system overhaul.

Working alongside the team at Sensible Heat to deliver a clean, serviceable and future-ready installation.

Thoughtful design. Precise ex*****on. Built to last.





When space is tight, nothing gets left to chance.Every component has its place. Every cable has its route. Every millime...
08/05/2026

When space is tight, nothing gets left to chance.

Every component has its place. Every cable has its route. Every millimetre matters.

Privacy glass transformers installed neatly into the final available space within the electrical systems cupboard — maintaining accessibility, ventilation, and serviceability without compromising the overall layout.

Good electrical work isn’t just about functionality. It’s about precision, planning, and making complex systems look effortless.

These transformers will power the smart privacy glass system throughout the property, integrating seamlessly into the wider KNX automation infrastructure.

Clean. Calculated. Intentional.





Zennio Bin-T 8x modules installed with DIN rail terminals in discreet but fully accessible remote locations across the p...
28/04/2026

Zennio Bin-T 8x modules installed with DIN rail terminals in discreet but fully accessible remote locations across the property.

These units are the backbone of the input layer — receiving signals from the PLH Neo switches (install to follow) and distributing commands across a fully integrated KNX system.

Lighting. Blinds. Privacy glass. Sliding doors. Louvres. Outdoor heating — all handled seamlessly.

Each module also provides LED feedback to the switches, giving the user clear visual status at every control point.

That’s the beauty of KNX — decentralised architecture, rock-solid reliability, and total flexibility. Every input, every output, every function… fully programmable, fully scalable.

No single point of failure. No limitations on expansion. Just clean logic and proper control.

This is how high-end residential should be done.





3xRU fully populated.1xRU currently in progress.2cRU scheduled next.144no Cat6a data cables installed, routed and termin...
15/04/2026

3xRU fully populated.
1xRU currently in progress.
2cRU scheduled next.

144no Cat6a data cables installed, routed and terminated into a structured rack system.

Full commercial-grade infrastructure delivered into a sinle high-end residential property penthouse. Clean layout. Scalable design. Zero compromise on spec.

This isn’t “home networking”.
This is proper infrastructure.

Compare that to your house.





#

12/04/2026

Progression of the main distribution board termination.

Starting point — a full cupboard of unstructured cables following install.

Circuits identified, separated, and routed to their respective boards and containment.

Equipment installed, positions finalised, and cable lengths managed to suit final termination.

Dressing carried out in stages to maintain access, grouping, and clear identification throughout.

Final stage shows the system at ~95% complete — all major terminations in, layout established, and ready for final checks and completion.

From unorganised install to structured, serviceable distribution.





Driver location dialled in.Centralised, accessible, and laid out with future maintenance in mind.All drivers mounted cle...
09/04/2026

Driver location dialled in.

Centralised, accessible, and laid out with future maintenance in mind.

All drivers mounted cleanly with clear segregation between circuits, and enough slack left for safe removal and replacement without disturbing terminations.

Neat cable routing throughout keeps everything identifiable and serviceable — no guesswork later.

One of those areas no one sees… but it matters most when you’re back on site.





Installation of Element Harmony 100W electric underfloor heating mats across two bathroom areas. Supplied via ElementSho...
07/04/2026

Installation of Element Harmony 100W electric underfloor heating mats across two bathroom areas. Supplied via ElementShop UK.

Laid, fixed, and positioned prior to application of self-levelling compound.

Resistance readings taken before covering, with cable spacing and layout checked to ensure even heat distribution.

Once buried, access is gone — everything confirmed at this stage.
Ready for encapsulation.





Installed Wisdom P4i in-wall speakers to the cinema TV feature wall.Mounted directly to MDF backing panels to ensure rig...
25/02/2026

Installed Wisdom P4i in-wall speakers to the cinema TV feature wall.

Mounted directly to MDF backing panels to ensure rigidity and correct acoustic support. Fabric finish to follow.

High performance, concealed installation, and built to integrate cleanly within the room design.





Floor box installation in progress.Best practice is to strip and loop through conductors prior to the flooring being lai...
24/02/2026

Floor box installation in progress.

Best practice is to strip and loop through conductors prior to the flooring being laid.

Allows full testing while access is clear and removes uncertainty later — you never quite know when you’ll return to second fix a floor box.

Preparation now avoids assumptions later.





Draft layout of computer-designed grid switch faceplates, showing final engraving schedules.Circuit functions mapped, no...
24/02/2026

Draft layout of computer-designed grid switch faceplates, showing final engraving schedules.

Circuit functions mapped, nomenclature agreed, and positions coordinated prior to manufacture.

All resolved at drawing stage — installation becomes straightforward.

Ready for second fix.





Address

London

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Live Earth Neutral posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Featured

Share

Category