16/10/2026
The batteries are now in place at our Common Farm BESS project. 🔋
With the units positioned and ready to be connected, we’re now getting the surrounding areas finished off.
The membrane and Terax system are in place, along with the timber edging, creating a contained area around the batteries in the event of any leakage.
A good look at where the project is up to and some of the work that goes on around the battery installation itself.