12/10/2026

Non-stop day on my own today. Finishing off the fascias and soffits , clearing scaffolding, pointing to ridge tiles , remived the old chimney vent and rauched with slate and mortar and Raked out and repainted the chimney stack ready for the final pieces of lead to be done whenever I get the chance to do that now .
Plus, delivery's today, kerb side drops only ! So, I had to load all the insulation and boiler in ready for the next tasks .

Office build underway and bedroom internal works started by myself today. Cut out bulge in ceiling to router cables,  mo...
02/10/2026

Office build underway and bedroom internal works started by myself today.
Cut out bulge in ceiling to router cables, moved and 1st fixed radiator pipes , then cracked on with the office framework.
Is there anything I can't do ! A few things are guaranteed when you get me . Value for money , I work extremely hard and quick , plus great banter! Always top workmanship.

28/09/2026

Boarding, electrics, plumbing , joinery all carried out this past week . Vision is all starting to come together now .

24/09/2026

A major personal milestone for myself today .
Loaded up the plasterboards, etc, and finally laid the very first plasterboard! Managed to get a lot done today with some more electrics, some plumbing, and ordering more materials .
The vision is starting to come together!
One man , one lad to complete all this .
Everything is level and square as it's all about doing the preparation right to make everything easy when starting to plaster!

24/09/2026

Kitchen fitted and all completed, with plastering, knock through, plumbing , electrics, and boxin in all sorted now.
Another happy client, another job completed.

15/09/2026

Footings dug and hand mixed / poured ready for retaining walls .
Brickwork finished, and steels / cavities were all blocked up and sealed (this brickwork will never be seen due to wrap around roofs )
Brickwork and sandstone lintels installed with my last window.
Now it's fully secured and watertight, ready to crack on inside next week.
Never-ending project!

14/09/2026

There were not many pictures on today as it was non-stop !
All materials supplied by
150mm mot.
50mm blind sand wacked down.
1200 gauge visqueen.
Shuttering.
200mm concrete mixed and poured with 8mm re bar sheeting cut to the size required.

An awful lot of work done in a day, especially with where we had to get the materials from due to the nature of the job, but we can certainly feel every ache and pain tonight!

Some finishing touches to a current kitchen fit after finishing laying the ridge tiles at mine.
08/09/2026

Some finishing touches to a current kitchen fit after finishing laying the ridge tiles at mine.

08/09/2026

Roof ready for pointing and lead work .
Then that will be one big task completed .

29/08/2026

Non-stop last week , apart from the times looking after my unwell boys , but we get through it.
Me and my eldest lad worked on the roof this afternoon to get as many tiles as we could get in with this weather and loaded out hopefully for tomorrow.

Big week next week, getting a few jobs all finished off and onto the next projects !

Rip dolly Parton, what a legend she is .

Address

Liverpool

Alerts

Be the first to know and let us send you an email when SC Property Development posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to SC Property Development:

Shortcuts

Share