Both scaffolds erected and ready for the cable pull in 20 days.
For this project the Lahyer system worked like a dream.
The scaffold was designed using components small enough to be lowered into the shaft in cages, resulting in a quicker er****on and dismantle process.
The collaboration within the design process created a workable design that was then executed brilliantly by all on site.
Top work all.