πŸ“ Bevi smart water dispenser Install – MoorgateThis system isn’t a standard cooler β€” it’s a Wi-Fi connected dispenser su...
04/01/2026

πŸ“ Bevi smart water dispenser Install – Moorgate

This system isn’t a standard cooler β€” it’s a Wi-Fi connected dispenser supplying filtered still and sparkling water, with multiple flavour options all controlled via a touchscreen interface.

To accommodate the unit, we lifted the raised floor, carefully ran a new cold water supply through the floor void, securely clipped and protected the pipework, and worked around existing services with minimal disruption.

Once installed and tested, the flooring was fully reinstated, leaving a clean, concealed finish and a fully operational smart dispenser ready for daily office use.

πŸ“§ info@aroundtheclocksolutions

πŸ”§ Revisit – Office | Canary Wharf β˜•οΈReturned to site to carry out permanent remedial works to the coffee machine drainag...
24/12/2025

πŸ”§ Revisit – Office | Canary Wharf β˜•οΈ

Returned to site to carry out permanent remedial works to the coffee machine drainage on behalf of Concept Interiors.

The original waste had insufficient fall. We re-routed the drainage to provide a direct and correct fall into the drain, ensuring proper operation and preventing future issues.

All works tested and left in full working order βœ…

πŸ“ Canary Wharf
πŸ•’ Commercial plumbing specialists
πŸ“ž Available 24/7

🚨 Emergency Call-Out | Canary Wharf 🚨Attended an urgent call-out to an office in Canary Wharf following a leak from a co...
23/12/2025

🚨 Emergency Call-Out | Canary Wharf 🚨

Attended an urgent call-out to an office in Canary Wharf following a leak from a coffee machine.

After investigation, the issue was found to be an incorrectly installed waste hose, which had insufficient fall to allow the waste water to drain correctly.

We were able to carry out a temporary repair by re-routing the hose to a lower drainage point to stop the leak and make the area safe.

We’re now booked back in tomorrow (Christmas Eve) to re-route the drainage properly and ensure a compliant, long-term installation.

πŸ“§ Get in touch: [email protected]

22/12/2025
πŸ“ HolbornRemoved the existing basin and installed a new vanity unit with a stylish basin, giving the space a modern, cle...
22/12/2025

πŸ“ Holborn

Removed the existing basin and installed a new vanity unit with a stylish basin, giving the space a modern, clean finish.
All plumbing altered, tested, and left in full working order.

πŸ“© Get in touch:
[email protected]

🚨 Boiler Call-Out – F.347 Fault 🚨Attended a boiler breakdown caused by a blocked condensate line.On investigation, the c...
21/12/2025

🚨 Boiler Call-Out – F.347 Fault 🚨

Attended a boiler breakdown caused by a blocked condensate line.
On investigation, the condensate pipework was found to be incorrectly installed and kinked, causing the fault.

Condensate drained, pipework altered and boiler fully tested and recommissioned.

βœ… Left in full working order.

πŸ“ Kensington, London

πŸ“ Mayfair, LondonFinal second-fix works completed at a high-end medical centre.Scope of works included the installation ...
20/12/2025

πŸ“ Mayfair, London

Final second-fix works completed at a high-end medical centre.
Scope of works included the installation of new basins, temperature testing, and full system checks, followed by final testing and commissioning.

All works were completed to a high standard, fully compliant, and handed over ready for use.

For professional plumbing services across offices, clinics, and commercial properties in London, feel free to get in touch.

19/12/2025
πŸ“ Bond Street – Site UpdateBack on site to complete the 2nd fix on a disabled bathroom, ensuring all fittings were insta...
19/12/2025

πŸ“ Bond Street – Site Update

Back on site to complete the 2nd fix on a disabled bathroom, ensuring all fittings were installed, tested, and left fully operational.

Also:
πŸ”§ Under-sink water heater finished and commissioned
🚰 Kitchen sink installed, connected, and tested

Everything checked, tested, and left working as it should.

πŸ“ Bond Street
πŸ“ž Around the Clock Solutions

Call out to Wembley for a blocked gully πŸ”§CCTV inspection carried out and found tree roots had grown into the gully, caus...
18/12/2025

Call out to Wembley for a blocked gully πŸ”§

CCTV inspection carried out and found tree roots had grown into the gully, causing damage and a blockage.

Concrete surrounding the gully was gunned out to gain access, the damaged gully removed and replaced, then fully tested and left running as it should. Recommendations given to help prevent future issues.

πŸ“ Wembley
πŸ“ž Around the Clock Solutions

Address

Upminster Road
Hornchurch
RM113

Alerts

Be the first to know and let us send you an email when Around The Clock Solutions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share