13/10/2026
The Ribbon: from the original CGI to the completed project.
Itโs always rewarding to look back at the original visuals and see how they compare with the finished building. In this case, the two views are from almost exactly the same angle.
Vision Arch delivered the design, supply, and installation of the buildingโs high-performance faรงades and openings, including curtain walling, fixed windows installed into precast concrete panels, sliding and bi-fold doors, copper dormer surrounds and plant screens. The project also included a number of complex faรงade interfaces, with curved-on-plan curtain walling, tight radii and feature arched window heads.
A great example of taking a detailed design from CGI through to the finished building.
Project team:
M&G Real Estate | Wates Group | Orms | Thorp Precast Limited | Schรผco UK and Ireland | Jansen Steel Systems | Vision Arch